logo

Omera to install Rooftop Solar System for Beximco

Thursday, 4 July 2024


Omera Renewable Energy Limited, a subsidiary of East Coast Group Company, signed an agreement with Beximco Group, a leading business conglomerate in Bangladesh, on Wednesday to install a 9.23 MW Grid-Tied Rooftop Solar System at Beximco Industrial Park, Gazipur, reports UNB.
The Power Purchase Agreement was signed at East Coast Centre in Gulshan in Dhaka, said a press release.
Dilruba Chowdhury, Director, East Coast Group, and Anil Kumar Maheshwari, Chief Financial Officer, Beximco Textiles Division, signed the 20-year power purchase contract.
Amin Sabir Khan, Executive Director, Power Generation, Distribution and Utility, Saqib Shakoor, Executive Director of Beximco, and Masudur Rahim, Chief Executive Officer, AKH Hasif Sowdagar, Chief Financial Officer, Capt. Minhazur Reza Chowdhury, Chief Operating Officer, Khan Ashique Rahman, Manager, and Umme Jahan Mishi, Asst. Manager of East Coast Group, were present at the signing ceremony.
Omera Solar with an aim of 'Go green Today For A Brighter Tomorrow' has already installed more than 60 MW of Rooftop Solar System on different industrial rooftops.
Omera Solar will install 9.23 MW Solar System which will generate 10.78 GWh of clean electricity each year, which will ensure Tk 104.46 million financial savings yearly on electricity bills for Beximco.