A new 233-metre bridge is under construction on Turag River at Amin Bazar point on Dhaka-Aricha highway, aimed at alleviating traffic congestion to and from the capital. The eight-lane bridge includes link roads on both sides and is a project running parallel to the existing Amin Bazar bridge. The current four-lane Amin Bazar bridge, built in 1971, is struggling to manage the increasing traffic flow from northern and northwestern districts into Dhaka. The photo taken recently. — FE photo by KAZ Sumon
A new 233-metre bridge is under construction on Turag River
FE Team | Published: August 31, 2023 00:29:11
A new 233-metre bridge is under construction on Turag River
Share if you like